This Engineering News article reveals: "Some of the potential project developers are reluctant because of that ...there is need for a new protocol or a new accord. The previous Copenhagen accord did not come up with a new protocol (beyond) 2012."
According to Tuwani, South Africa has 17 CDM projects registered to date, of which only four have been issued with CERs. The top two nations in the scheme, according to UN figures, are China with 787 projects and India with 498." Read more here.
green news / eco news / renewable energy news out of South Africa, Africa and internationally
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2010
(176)
-
▼
April
(23)
- More News
- News in a Rush
- Earthlife Africa Demonstration Outside Parliament ...
- Planes or Volcano? Which Emitts More CO2 into the ...
- Eskom's Secret Deals Revealed
- New EIA Regulations to be Published Soon
- Separate Power Transmission Company to be Formed Soon
- Renewable Energy Partnership Launched on Weds
- SA Lagging Behind in Clean Energy Projects
- Feedback from Latest UN Climate Change Talks - Bon...
- City of Cape Town to Soon Sell "Green Electricity"...
- First Annual Climate Change Leadership Awards
- Two new wind projects on the cards for Eastern Cape
- Some Thoughts on the Approval of the World Bank Lo...
- Boost for RE in Africa - from Europe
- News Snippets
- Draft IRP2 Consultation Process
- Successful Test Flight for Solar Plane
- National Air Quality Act Come into Full Effect on ...
- Some Thoughts on World Bank Loan to Eskom
- Clarity on REFIT Selection Criteria Seeked
- UN List Reveals over 110 Nations back Copenhagen A...
- Darling Wind Farm Expanding?
-
▼
April
(23)
Disclaimer: This blog is updated as often as possible on a voluntary basis and we cannot guarantee that we will be able to report on all current environmental or other relevant news. Although every effort is made to ensure the accuracy and correctness of the contents of this blog, we are not responsible for any possible errors or omissions.
No comments:
Post a Comment